HomeNigeriaBuilding Approval Alignment Will Reduce Project Delays – President Tinubu

Building Approval Alignment Will Reduce Project Delays – President Tinubu

Temitope Mustapha

Nigeria’s President, Bola Ahmed Tinubu, has called on governors to collaborate with the federal government to align building approvals, thereby reducing the burden of compensation and delays in actualising people-oriented projects.

The President expressed confidence that increased funding will be dedicated to infrastructure development, emphasising that proper approval coordination between sub-national and federal governments will support the building of major roads and bridges nationwide.

Read Also: Nigerian Leader Flags Off Major Infrastructure Projects in Northern Region

President Tinubu stated these on Thursday during the commissioning of the Lekki Deep Sea Port Access Road at the Dangote Refinery and Petrochemical Plant in Lagos.

The President said, “I have directed the Minister of Works, David Umahi, and the Surveyor General of the federation to work more closely with the governors.

“Please, my dear governors, let’s work together. Don’t give planning approvals without collaboration with the Surveyor General and the Ministry of Works. I am appealing to you to realise the same development goal.

” Let me emphasise the ban by the Federal Government of Nigeria on any dredging within a 10km radius of all our Bridges nationwide. I appeal to all governors, relevant agencies, and security agencies to implement this ban immediately.“ President Tinubu said.

The ceremony came five days after the President commissioned Phase 1 of Section One of the Lagos-Calabar Coastal Highway, also in Lagos.

He commended the Federal Ministry of Works, Messrs Hitech Construction Company Limited, Messrs Dangote Industries Limited, BUA and all contractors involved in the country’s road development.

President Tinubu said he had directed accelerated design on the 4th Legacy Project of the Akwanga-Jos-Bauchi and Gombe corridor to enable procurement to start.

“Let me assure you that with God on our side, we shall complete these projects and deploy them for the economic benefit of our nation”.

Other projects commissioned by the President include Yakasai to Zalli Road, Kano State (CCECC), Shendam Bridge, Plateau State (Triacta), Kwanar-Hadejia Section II (82km), Kano/Jigawa States (CCECC), Jimeta Bridge, Adamawa State (Triacta), Ilobu-Erinle Road, Kwara/Osun States (IAC) and Cham-Numan Bridge, Adamawa State (CGC).

President Tinubu flagged off the following projects for construction: Section I Phase IB-120km of Sokoto-Badagry Superhighway in Sokoto State; construction of Section II Phase 2 B-258 km of Sokoto-Badagry Superhighway in Kebbi State; construction of Lagos–Calabar Coastal Highway (Section II)-55km in Lagos to Ogun State Border; rehabilitation of Zaria-Hunkuyi to Daya Road (Sections I, II & III) 152.67km in Kaduna/Kano States and reconstruction of Dikwa – Gamboru – Ngala Road – 49.55km in Borno State.

Also flagged off was the completion of the dualisation of the Kano – Maiduguri Road linking Kano – Jigawa – Bauchi – Yobe and Borno States; 100.95km, construction of Maiduguri Ring Road – 108km, construction of Kano Northern Bypass Road in Kano State, – 74km; construction of 7th Axial Road at Lekki Deep Sea Port, Lagos State to Ijebu-Ode, Ogun State– 25km by 6-lane and completion of rehabilitation of Lokoja – Benin road on rigid pavement.

Other roads are the dualisation of Oyo—Ogbomoso Road in Oyo State, 104km; the dualisation of Kano—Daura—Kongolam in Kano, Jigawa, and Katsina States, 264km –BUA Tax Credit; and the reconstruction of Bama–Banki Road in Borno State, 49.15 km Dangote Tax Credit.

The President thanked the “four wise men of the private sector”: Jim Ovia, Femi Otedola, Abdulsamad Rabiu, and Aliko Dangote, for contributing to Nigeria’s economy.

He also commended the Minister of Works, Roland and Gilbert Chagoury, and Aigboje Aig-Imoukhuede.

The governors of Plateau, Abia, Enugu, Ogun, Borno, and Kaduna states attended the ceremony.

Speaking on behalf of the governors, the Governor of Kaduna State, Sen. Uba Sani, thanked the President for removing the subsidy, which had translated into increased allocations to the states for health, education, and infrastructure investments.

Sani assured the President of the sub-national collaboration to improve infrastructure nationwide.

President Tinubu thanked Alhaji Aliko Dangote for his interest in developing the country through continuous investments.

“Having inspected the Dangote refinery, which is a great point of reference, a great phenomenon of our time and a massive investment, I want to thank Aliko Dangote,” he stated. “I am happy that the Deep Sea Port I initiated as Governor of Lagos State is a huge success today. Users save vast amounts of money using this port because they no longer need to trans-ship their goods. I commend the quality of the access road done by Messrs Dangote Industries Limited on our Tax Credit Road programme and the subcontractor, Messrs Hitech Construction Company Limited.

The president of the Dangote Group, Aliko Dangote, thanked the President for envisioning and implementing the Lekki Deep Sea Port project and assured him of the private sector’s support for expanding infrastructure nationwide.

 

 

 

RELATED ARTICLES

Most Popular

Recent Comments